Step 1: Open the Insert tab on Excel’s ribbon and click on SmartArt in the Illustrations category. (Click any image in this article for a larger view.)

click to enlarge
Step 2: In the Choose a SmartArt Graphic window, locate the diagram that you want to use a basis for your project timeline. For this example, we’ll select the Basic Timeline graphic found in the Process grouping.

click to enlarge
Click OK and the object will be inserted into the Excel spreadsheet. If you don’t like where the object was placed, you can click and drag the timeline to a new location on the worksheet.

click to enlarge
Step 3: Click on any of the text placeholders to begin entering your own information. Note that you can format the text here just as you would any other text in Excel. That is, you can go to the Home tab on the Excel ribbon and make changes to font style, shape, and color.

click to enlarge
When typing in the text, the text size will automatically adjust to fit within the confines of the text box. If you’d rather the text remain a specific size, you can resize the text box instead by clicking on the object and dragging one of the small circles centrally located on the borders of the text box.

click to enlarge
Step 4: Continue adding important dates to the timeline. Unless your list of dates is very short, you’ll quickly run out of spaces on the predesigned timeline. To add more, right-click on the portion of the timeline where you want to insert a new event and select Add Shape. Then you can choose whether you want to insert the shape before or after that point on the timeline.

click to enlarge
This will add a new marker on the timeline as well as a text box where you can immediately begin typing.

click to enlarge
There is one thing important to note here. If you plan on adding several new points on the timeline at once and then going back to fill in the text boxes with event information and dates later, make sure to go ahead and type something in the text box as soon as it is created. You don’t have to type much – even something as simple as “text” will do. The only reason for doing this is to include some type of text that will serve as a placeholder so you can easily go back to it and edit it later.
Step 5 (optional): Once you’ve entered in all of the timeline information, you can make changes to the appearance and formatting of the object by going to the Design and Format tabs under SmartArt Tools on the Excel ribbon. There are tons of choices you can make here and the possibilities are almost endless. Below is one example of how a couple of formatting changes can give the project timeline a whole new appearance.

click to enlarge
Additional Resources: For more tips on how to construct various charts and diagrams as well as links to free templates that you can download and modify as desired, check out the collection of other Excel project management templates and tutorials here on Bright Hub’s Project Management Channel.