I have frequently mentioned that the parts need to be inspected at regular intervals but it remains to be seen how often does this need to be carried out. The time interval can be decided based on manufacturers instructions, frequency of use and previous experience of shipboard engineers and the period of inspection could vary widely based on the component or section under consideration and the type of activity to be carried out. Inspection can be frequent by overhauling needs to be given a time gap to prevent unnecessary wastage of time. For example in case of flue gas isolating valve it can be checked for operation once in a week while the deck water seal can be opened for overhaul twice a year.